Project Type
Location
all
Aachen Andernach am Rhein Bad Driburg Basel Berlin Bonn Brühl Cologne Danzig Darmstadt Dormagen Dresden Duisburg Duisburg-Rheinhausen Düsseldorf Erfurt Essen Essen Rüttenscheid Frankfurt am Main Gummersbach Hagen Halle Hamburg Hanau Hannover Herne Ingolstadt Kempen Krakau Krefeld Kreuztal Langenhagen Leipzig Lippstadt Lübeck Luxemburg Manching Mannheim Menden Mettmann Mönchengladbach Moskau Mülheim a.d. Ruhr Munich Münster Neunburg vorm Wald Neuss Neustadt Nordhorn Oberhausen Oberstdorf Oldenburg Osburg Osnabrück Potsdam Ratingen Regensburg Remscheid Schloss Holte-Stukenbrock Shanghai Sochi Stuttgart Trier Troisdorf Venedig Warschau Wilhelmshaven Willich Wolfsburg Wuppertal Würzburg Xuancheng
Disable all filters
Format: 2017
Format: 2017

Pages

T23 Aggregate Centre. Ingolstadt


Technical Development (TE) at the Audi plant in Ingolstadt is undergoing expansion. RKW has now planned the second section of the company's GEZ Gear and Emission Centre. The new build picks up on the colours and materials of the existing Technical Development buildings. On a total gross building area of 22,000 m2, workspace will be created for 488 employees, with four storeys available for office use. The technical highlight of the new building is the testing facility level on the ground floor. Here, the Emission Centre has a range of exhaust test rigs equipped with what are known as SHEDs, gas-tight chambers for emission testing, supplemented by airlocks and analytics sections. The Gear Center is also located here, with more test stands for front and four-wheel drive vehicles and space for paternoster systems. Workshops and laboratories are situated on the first floor and accessed on a ramp. The building is a reinforced steel construction with increased floor loads and is supplied as far as possible with light and ventilation from natural sources. Another of its special features is the "meeting bridge", which connects the new build with the first section and holds two conference rooms and four think tanks.